Deerfield Conservation Commission Approves MassDOT Rotary Project With Wetland Buffer Conditions

DEERFIELD — May 28, 2026 — Deerfield Conservation Commission closes MassDOT rotary hearing, adds driveway barrier and biennial basin-monitoring conditions. The commission voted 5-0 Thursday to approve a Notice of Intent for MassDOT District 2's intersection improvement project at Greenfield Road (Routes 5 and 10) at Mill Village Road and North Main Street (Project 613708), attaching three conditions to the order: the town's standard order of conditions, a physical barrier — chain barrier with a "no entry" sign or boulders — to block vehicular access to a disputed abutter driveway constructed under permit 2-2018-0347, and a biennial stormwater catch basin maintenance report due December 31 after every two-year period following construction. MassDOT representative Robin Hunter pushed back on the basin reporting requirement, noting the agency oversees approximately 13,000 catch basins across 56 communities and that all 16 basins on this project would be brand new, but Chair Sean Libbey held firm, calling the area "the upper part of the floodplain basin of Bloody Brook coming into the middle of town." The commission also voted 5-0 to approve a timber harvest and invasive plant management request at 323 Conway Road and scheduled a June 11 special meeting to address a contested scour pad design at Frontier Regional School's 113 North Main Street parking lot project before post-graduation construction begins.

Keep reading with a 14-day free trial

Subscribe to Franklin County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Franklin County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe